The challenge
When critical power equipment fails, everything stops.
A single failed transformer or generator can take a power plant off the grid, or leave a factory, estate or office building without supply. Every day of downtime has a cost, and new equipment from the manufacturer can take a long time to arrive.
Long manufacturer lead times
Large power transformers, turbine components and large generating sets are built to order, with long manufacturing queues. Relying on new units alone leaves supply interrupted through manufacturing, shipping and installation.
The cost of downtime
Power plants lose energy and capacity payments. Businesses, estates and offices lose productivity and fall back on expensive diesel backup. Long outages strain cash flow just when capital is needed for replacements.
Many parties to coordinate
Owners, manufacturers, refurbishment contractors, logistics providers, the system operator and financiers all have to work to one plan. Without a single point of accountability, schedules slip.